Logo image
About How-To Guide
Sign in
Mission Cost and Reliability of 1-out-of- N Warm Standby Systems With Imperfect Switching Mechanisms
Journal article   Peer reviewed

Mission Cost and Reliability of 1-out-of- N Warm Standby Systems With Imperfect Switching Mechanisms

Gregory Levitin, Liudong Xing and Yuanshun Dai
IEEE transactions on systems, man, and cybernetics. Systems, Vol.44(9), pp.1262-1271
09/01/2014

Abstract

1-out-of-N: G system Fault detection Frequency division multiplexing imperfect switch mission cost Redundancy reliability Stress Switches Vectors warm-standby system

Metrics

1 Record Views

Details

Logo image